Data Center Design Construction Expansion

Data Center Design and Construction Expansion Project

EEC recently completed this data center expansion project for a large automobile services company

(Client would not allow pictures to be taken)

This project consisted of a data center design/build renovation and expansion of an existing 800 sq/ft data center which included infrastructure upgrade and increase of overall footprint. The existing and expanded data center had to utilize independent cooling systems (separate from the building plant), independent electrical supply and redundant UPS and cooling equipment.

Additional infrastructure was added to their UPS room, UPS/Switch room and the data center. These renovated rooms are now primarily cooled by a dedicated Glycol Cooling System being distributed by a two 15 hp Glycol Pump Package with three 3- fan Liebert dry coolers located on the roof of the 4th floor. All rooms are now protected by a new fire suppression system and environmental monitoring was added to monitor the new Liebert equipment installed, all fire suppression/detection systems, the existing UPS system and the water detection system was expanded.

The renovation consisted of decommissioning and removal of four up-flow computer room air conditioning units and three roof top dry coolers. Demolition of existing interior walls and ceiling to accommodate new expanded data center area. Construction of new and repairing of existing walls; all walls were constructed and/or repaired to conform to the UL 419 1 hour assembly rating. Installation of a new suspended ceiling system with 24” x 24” vinyl faced acoustical panels, new lighting throughout expansion area and raised access floor with 1/16” high performance.

EEC coordinated all delivery and rigging for provided equipment and also coordinated the equipment start-up and certifications services for all new equipment with the factory authorized technicians. The company also contracts with EEC to maintain all UPS systems, UPS batteries, HVAC systems, and fire suppression/detection systems.

Below are the details of the project:

850 sq/ft Data Center expansion area with a Tate 12” Raised Access Floor System

Protected by:

  • Novec 1230 Fire Suppression System
  • Pre-Action Sprinkler Fire Suppression System
  • Photoelectric and Ionization Smoke Detection

Cooled by:

  • Two Liebert 15-Ton DS Down Flow AC units

Room Power Distribution:

  • Two Square D 42-Pole Panel boards

Raised Access Floor System

  • Tate Access Floor System
  • ConCore Tiles rated for a 1250 design load
  • Supported by a 4’ basket weave bolted stringer system

140 sq/ft Existing UPS Room

Protected by:

  • Novec 1230 Fire Suppression System
  • Pre-Action Sprinkler Fire Suppression System
  • Photoelectric and Ionization Smoke Detection

Cooled by:

  • One Liebert 5-Ton Mini-Mate AC unit

800 sq/ft Existing UPS/Switch Room

Protected by:

  • Novec 1230 Fire Suppression system
  • Pre-Action Sprinkler Fire Suppression System
  • Photoelectric and Ionization Smoke Detection

Cooled by:

  • One Liebert 15-Ton DS Down Flow AC unit

UPS Power:

  • One Liebert NX Series 160 kVA Uninterruptible Power Supply
  •  Two 40 Jar UPS Battery Cabinets
  • One 600 AMP Maintenance Bypass Panelboard

Room Power Distribution:

  • One Square D 42-Pole Panel boards.

1,500 sq/ft Existing Data Center

Protected by:

  • Novec 1230 Fire Suppression system
  • Pre-Action Sprinkler Fire Suppression System
  • Photoelectric and Ionization Smoke Detection

Cooled by:

  • Two Liebert 15-Ton DS Down Flow AC unit

Room Power Distribution:

  • Three Square D 42-Pole Panel boards
  • One 800 AMP Maintenance Bypass Panel in main electrical room
  • One 400 AMP MLO circuit breaker panel

Environmental Monitoring

  • Expanded RLE LD2500 water detection system to monitor under the expansion area raised access floor system
  • One Liebert N-Form Enterprise Edition Complete Monitoring Solution. This system is currently monitoring all the new Liebert equipment installed, all fire suppression/detection systems, as well as the existing UPS system.

* Client would not allow pictures to be taken.